  • Last fall, the barns at the Stables were painted. There will be more painting going on this spring when the weather gets warmer. The next set of buildings to be painted will be the Stables office/snack shop and vaulting barrel gym. Then all of the buildings at the Stables and Bayview will have a fresh look.
  • CLWallProjectThe repair work on the end-wall in the Cedar Lodge Dining Room is finally getting done! New windows, doors, and exterior finish will dress up the appearance of the building, improve energy efficiency, repair the rot in the wall, replace a broken window, and tantalize us with how nice the rest of that wing will look in the future when similar improvements are made. Work will be completed on this project by the end of this month.
  • The refurbishment of Cedar Lodge Chapel has finally begun. The water and sewer lines have been connected so the two family restrooms just outside the Chapel can be finished. The windows in the Chapel will be replaced, new window coverings installed, and interior and exterior paint will be applied. Interior work will begin this month and continue through May, and possibly into the summer. This is the third and final phase of the Cedar Lodge renovation project made possible by the funds raised through the Embracing the Vision Campaign several years ago.
  • Bids are being received from contractors for the work on installing the new, wider sidewalk from the Senior Community to Maple Center. This project will replace the cracked and broken four-foot sidewalk with a new ten-foot one, improve safety and accommodate more pedestrian traffic. This work will be done between now and the end of May.
  • A major culvert on a section of road leading to the wastewater treatment plant failed recently, resulting in a major sinkhole. This led to an extensive culvert replacement project and road improvements from the Stables to the Wastewater Treatment Plant.
  • We are working through a list of spring projects, getting the roads and grounds ready for summer. Beauty bark is being applied to flower beds on the main grounds, and improvements are being made to the landscaping around Cascadian. Habitat restoration work, planting native plants around Bayview, as required by our County Conditional Use Permit, continues. Extensive work still needs to be done to the gravel roads on the grounds.

If you are interested in volunteering to help with any projects, whether you have a few hours or a few days, call Jessica Wilson at (360) 312-3417 or send her an email.

Set Apart Youth

Youth today are bombarded by countless streams of entertainment and information. How are these young people supposed to find peace and purpose in their lives if they don’t have access to quiet and peaceful places to be refreshed? This past winter, 230 teenagers had the opportunity to visit Warm Beach Camp to escape the demands of everyday life and realized the power of deliberate living. Community Church of Seattle (CCS) hosted its NEXT Winter Retreat at Warm Beach Camp this ...

Trust and Deliverance

Here are some words of guidance for times of trouble from a very wise person. IN TIME OF TROUBLE SAY: FIRST- He brought me here-it is by His will I am in this strait place; in that will I rest. NEXT- He will keep me in His love, and give me grace in this trial to behave as His child. THEN- He will make the trial a blessing, teaching me the lessons He means me to learn, and working in ...

Ride of a Lifetime

“Don’t you want to retire so you can do all the things you’ve ever dreamed about?” It’s a question that I’ve been asked a lot. My answer, “I have gotten to do way more than I could have ever imagined in my wildest dreams these last 50 years in Christian Camping!” Little did we realize what was ahead when my husband, Stan, was finishing up his last trek of college education. We were lying on a blanket, soaking up the ...